MallberryConstruction Services 07345 044294 Get a quote

Building · Demolition · Removals — London

Heavy lifting, done gently.

We build new homes and extensions, take down what has to go, and move people and their things in between. One crew, one programme and one number to call — from the first lift to the last box.

Grab the load

The name

Part mallet. Part berry.

A sledgehammer striking the ground, grit flying

mall (n., old) — a heavy mallet.

Pall Mall and The Mall, a few minutes' walk from our office on Haymarket, take their names from a game once played along them with one.

It's the part of the job that needs weight: breaking out, taking down, lifting steel into place.

A hand holding ripe and unripe mulberries

berry (n.) — bruises if you look at it.

At the far end of The Mall, where Buckingham Palace stands, James I planted a mulberry garden in 1608.

It's the part of the job that needs care: your floors, your neighbours, your grandmother's teacups.

Every job needs both. Most firms are only good at one.

What we do

Three jobs. One crew.

Most projects need more than one trade. A rebuild needs a demolition crew first; a big build needs a removal team before and after. We do all three, so nothing waits on someone else's diary.

A brick house with a new timber roof going up inside scaffolding

Build

New homes, extensions and structural work.

  • New-build and replacement houses
  • Rear, side-return and wraparound extensions
  • Loft conversions and knock-throughs
  • Full refurbishments
Building
An excavator taking down an old two-storey house

Take down

Careful demolition and strip-out.

  • Garages, outbuildings and conservatories
  • Whole-house demolition for rebuilds
  • Soft strip and internal walls
  • Site clearance, sorted for recycling
Demolition
A removal worker wheeling a stack of boxes from a white van

Move

Removals for homes and offices.

  • House and flat moves
  • Packing, materials and fragile items
  • Pianos, antiques and heavy pieces
  • Office and small business moves
Removals
A London stock-brick terrace with a red door and a blue door

All three at once

Knock down and rebuild, without the gaps.

Replacing an old house? We move you out and store what you keep, take the old building down, build the new one, and move you back in. One contract, one programme, no gap between trades.

  1. Move out
  2. Take down
  3. Build
  4. Move back in
How a rebuild runs

On the hook

From a berry to a building.

The same three rules for everything we lift: plan it, protect it, put it down where it's meant to go.

  1. The name

    A mulberry 4 g

    The lightest thing we'll ever carry — and the standard for everything else.

  2. Move

    A teacup 0.2 kg

    Wrapped, boxed upright, marked fragile and labelled by room.

  3. Move

    A box of books 18 kg

    We keep boxes to around 20 kg, so nothing gives way on the stairs. Nobody either.

  4. Move

    An upright piano 230 kg

    Four people, a piano board, and a plan for every step and turn.

  5. Build

    A steel beam 320 kg

    For the knock-through: propped, lifted and seated on padstones the day the wall comes out.

  6. Build

    A timber-frame panel 0.9 t

    Made off site and craned in, so a new home is weathertight in days, not weeks.

  7. Take down

    A precast garage wall 1.4 t

    Lifted out whole, not smashed: quieter, cleaner and safer for next door.

  8. Take down

    A full skip 6.5 t

    Sorted as it's filled — brick, timber, metal, plaster — so most of it is recycled, not buried.

Not to scale. Obviously.

Same hook. Same care.

How a job runs

Four steps. No surprises in between.

  1. 01

    Survey

    We come and look: the house, the access, the street, the neighbours. For moves we can survey by video call.

    Free · usually within a week

  2. 02

    Plan

    A fixed written quote, a programme by the week, and the paperwork: notices, surveys, permits, insurance.

    Quote within 5 working days

  3. 03

    Lift

    One site lead runs the job and sends you a written update every Friday. Changes are priced before they're done, never after.

    One lead · one number

  4. 04

    Hand over

    Snags walked together, certificates in one folder, the site left swept. Then, if you want us to, we move you in.

    Final payment after sign-off

Done gently

What gentle looks like on a building site.

A kitchen mid-renovation with its units wrapped in protective sheeting

Covered before we touch

Floors, stairs, doors and kitchens are sheeted and boarded on day one. Furniture travels in blankets, not bin bags.

Neighbours hear it from us first

A letter before we start, our number on the hoarding, quiet hours kept, and the pavement swept at the end of every day.

Sorted, not dumped

Waste leaves with licensed carriers and a transfer note for every load. Brick, metal and timber are separated on site.

Paperwork that's actually done

Risk assessments and method statements for every job, asbestos surveyed before anything comes down, CDM duties met, insurance certificates on request.

Why mulberry? On a lifting sling, violet means one tonne — it's the colour code for a 1,000 kg round sling. We liked that our colour already meant “rated, checked, safe to lift”.

Free survey · fixed written quote

Got something heavy?

Tell us what needs building, taking down or moving. We'll come and look, and send a fixed written quote.