New houses
Replacement dwellings and infill plots, from foundations to the front door. Timber frame or masonry.
Typically 6–12 months on site
HomeServices
Building, demolition and removals — run by one crew, on one programme, with one person to call. Book any one of them, or all three.
Build
From a single-storey rear extension to a new house on a cleared plot. We price from your drawings, run building control, and build to the dates we gave you.


Replacement dwellings and infill plots, from foundations to the front door. Timber frame or masonry.
Typically 6–12 months on site
Rear, side-return and wraparound — with the steel, the glazing and the kitchen that goes in them.
Typically 10–16 weeks
Dormer and hip-to-gable lofts. Walls taken out on steel beams, propped, checked and signed off.
Typically 6–10 weeks
Whole-house strip and refit: rewiring, heating, plastering, joinery and decoration, in a sensible order.
Phased if you're living in
Take down
Most of what we take down stands next to somebody's home. So buildings come down in the reverse of the order they went up — by hand where it's tight, by machine where it's safe — and everything that comes out is sorted.


Concrete sectional garages, sheds and outhouses — out in a day or two, base and all if you need it.
Often 1–3 days
Full demolition for a rebuild: soft strip, structure, slab and foundations, then a level, clean plot.
Typically 2–4 weeks
Kitchens, bathrooms, ceilings and partitions taken back to the shell ahead of a refurbishment.
Homes, shops and offices
Overgrown plots, rubble, old foundations and stumps cleared and left ready for the next job.
With waste transfer notes
The paperwork side of a demolition, in the order we do it. You'll get dates for your own job in the plan.
Week −10
A refurbishment and demolition asbestos survey. Licensed removal is booked if anything's found.
Week −8
Served on the neighbours where the Party Wall Act applies — usually two months ahead.
Week −6
A Section 80 notice to the council, and prior approval where the building needs it.
Week −4
Gas, electricity, water and telecoms disconnected and capped by the suppliers.
Week −1
Letters with dates, hours and our number. Hoarding up, and a skip or pavement licence if needed.
Week 0
Soft strip first, then the structure from the top down, then the slab. Then a level, clean site.
Timings are typical. They depend on your council, your neighbours and the utility companies.
Move
A fixed price after a survey — in person or by video. We bring the boxes, pack if you'd like us to, wrap the furniture, and put everything in the room it's labelled for.


Flats and houses, across London or further afield. The same crew loads and unloads.
From a studio to five bedrooms
Full or fragile-only packing the day before — or just the boxes, dropped off early.
Materials supplied
Pianos, safes, antiques, art and mirrors, with the right kit and enough people for the stairs.
Assessed at the survey
Desks, files and IT moved in the evening or at the weekend, so Monday starts on time.
Evenings & weekends
A guide only. Stairs, lifts, parking and distance all change it — the survey is free.
Book a move surveyAll three
The hard part of a rebuild is the gaps: between the movers and the demolition crew, between the demolition crew and the builders. When one firm does all of it, the gaps are that firm's problem — not yours.

Move out & storeDay 1
Take downWeeks 1–4
GroundworksMonths 1–3
BuildMonths 3–10
Finish & hand overMonths 10–11½
Move back inThe last day
A typical replacement house, about a year end to end. Yours gets its own programme, by the week, before anything is signed.
Pricing
Every quote is fixed and in writing. If something changes, you get a price for the change before we do it.
Build
A fixed price for each stage, from the drawings. Payments follow the work as it's done — never far ahead of it.
Take down
One price for the paperwork, the demolition, the waste and a level site. Asbestos removal is priced separately if the survey finds any.
Move
A fixed price for the move. Stairs, long carries and parking are in it — not added on the day.
Questions
Building and demolition across Greater London and the home counties. For removals we go wherever you're going — tell us where.
Yes. Each service stands on its own. The combined rebuild is there if you want one contract for the lot.
We build from your architect's drawings, or can introduce you to one. On our jobs we handle building control and coordinate the structural engineer. Planning applications are made in your name; we'll help you prepare them.
Any building put up before 2000 can contain asbestos. Before a demolition or strip-out we commission a survey; if anything is found, a licensed contractor removes it before we start.
Two to four weeks is comfortable; Fridays at the end of the month go first. We'll always try to help at short notice.
Yes. Our certificates come with your quote, and we're happy to add your managing agent or freeholder as an interested party where they ask for it.
Building: stage payments against completed work, with the final payment after sign-off. Demolition: a deposit, then the balance at completion. Removals: a deposit to hold the date, the rest on the day. The details are in your quote.
Free survey · fixed written quote
Building, taking down or moving — or all three. We'll come and look, and send a fixed written quote within five working days.