MallberryConstruction Services 07345 044294 Get a quote

HomeServices

Three jobs. One hook.

Building, demolition and removals — run by one crew, on one programme, with one person to call. Book any one of them, or all three.

Build

New homes and extensions, built to the programme.

From a single-storey rear extension to a new house on a cleared plot. We price from your drawings, run building control, and build to the dates we gave you.

  • A fixed price for each stage, agreed before we start
  • Building control and the structural engineer coordinated by us
  • Party wall notices and neighbour letters handled
  • Certificates, guarantees and manuals in one folder at hand-over
A bricklayer setting a concrete block on fresh mortar
A finished white-rendered rear extension on a semi-detached house

New houses

Replacement dwellings and infill plots, from foundations to the front door. Timber frame or masonry.

Typically 6–12 months on site

Extensions

Rear, side-return and wraparound — with the steel, the glazing and the kitchen that goes in them.

Typically 10–16 weeks

Lofts & knock-throughs

Dormer and hip-to-gable lofts. Walls taken out on steel beams, propped, checked and signed off.

Typically 6–10 weeks

Refurbishment

Whole-house strip and refit: rewiring, heating, plastering, joinery and decoration, in a sensible order.

Phased if you're living in

Take down

Demolition, without the drama.

Most of what we take down stands next to somebody's home. So buildings come down in the reverse of the order they went up — by hand where it's tight, by machine where it's safe — and everything that comes out is sorted.

  • Asbestos surveyed before anything comes down
  • Gas, power and water isolated by the people who supply them
  • Dust and noise kept down, working hours kept
  • Waste sorted on site, with a transfer note for every load
A room stripped back to its shell, held up on steel props
A tracked loader taking down a single-storey timber building

Garages & outbuildings

Concrete sectional garages, sheds and outhouses — out in a day or two, base and all if you need it.

Often 1–3 days

Whole houses

Full demolition for a rebuild: soft strip, structure, slab and foundations, then a level, clean plot.

Typically 2–4 weeks

Soft strip

Kitchens, bathrooms, ceilings and partitions taken back to the shell ahead of a refurbishment.

Homes, shops and offices

Site clearance

Overgrown plots, rubble, old foundations and stumps cleared and left ready for the next job.

With waste transfer notes

Before anything comes down.

The paperwork side of a demolition, in the order we do it. You'll get dates for your own job in the plan.

  1. Week −10

    Survey & asbestos

    A refurbishment and demolition asbestos survey. Licensed removal is booked if anything's found.

  2. Week −8

    Party wall notices

    Served on the neighbours where the Party Wall Act applies — usually two months ahead.

  3. Week −6

    Council notices

    A Section 80 notice to the council, and prior approval where the building needs it.

  4. Week −4

    Services off

    Gas, electricity, water and telecoms disconnected and capped by the suppliers.

  5. Week −1

    The street told

    Letters with dates, hours and our number. Hoarding up, and a skip or pavement licence if needed.

  6. Week 0

    Down, in order

    Soft strip first, then the structure from the top down, then the slab. Then a level, clean site.

Timings are typical. They depend on your council, your neighbours and the utility companies.

Move

Removals, handled like heirlooms.

A fixed price after a survey — in person or by video. We bring the boxes, pack if you'd like us to, wrap the furniture, and put everything in the room it's labelled for.

  • A fixed price from a survey, not an hourly guess
  • Boxes, paper and wardrobe cartons supplied
  • Furniture blanket-wrapped; beds and wardrobes taken apart and rebuilt
  • Insured in transit — the details come with your quote
A woman packing a box in a living room full of cartons
The open back of a white van loaded with furniture

Home moves

Flats and houses, across London or further afield. The same crew loads and unloads.

From a studio to five bedrooms

Packing

Full or fragile-only packing the day before — or just the boxes, dropped off early.

Materials supplied

Heavy & fragile

Pianos, safes, antiques, art and mirrors, with the right kit and enough people for the stairs.

Assessed at the survey

Office moves

Desks, files and IT moved in the evening or at the weekend, so Monday starts on time.

Evenings & weekends

How big is your move?

A rough guide to the vehicle and crew. The survey sets the actual price.

Bedrooms
Also moving
Volume
≈ 26 m³
Vehicle
One 7.5 t lorry
Crew
3 people
On the day
One day

A guide only. Stairs, lifts, parking and distance all change it — the survey is free.

Book a move survey

All three

Knock down and rebuild, on one contract.

The hard part of a rebuild is the gaps: between the movers and the demolition crew, between the demolition crew and the builders. When one firm does all of it, the gaps are that firm's problem — not yours.

A hand holding a set of house keys in a bright new hallway

A typical replacement house, about a year end to end. Yours gets its own programme, by the week, before anything is signed.

Pricing

Fixed prices, written down.

Every quote is fixed and in writing. If something changes, you get a price for the change before we do it.

Build

By the stage

A fixed price for each stage, from the drawings. Payments follow the work as it's done — never far ahead of it.

Take down

By the job

One price for the paperwork, the demolition, the waste and a level site. Asbestos removal is priced separately if the survey finds any.

Move

From the survey

A fixed price for the move. Stairs, long carries and parking are in it — not added on the day.

Always included

  • A free survey
  • A written quote within 5 working days
  • One site lead, one phone number
  • A written update every Friday on building jobs
  • Waste transfer notes for every load
  • A swept, tidy site at the end

Questions

Asked before the first lift.

Where do you work?

Building and demolition across Greater London and the home counties. For removals we go wherever you're going — tell us where.

Can you do just one part — say, only the demolition?

Yes. Each service stands on its own. The combined rebuild is there if you want one contract for the lot.

Who deals with planning and building regulations?

We build from your architect's drawings, or can introduce you to one. On our jobs we handle building control and coordinate the structural engineer. Planning applications are made in your name; we'll help you prepare them.

What happens about asbestos?

Any building put up before 2000 can contain asbestos. Before a demolition or strip-out we commission a survey; if anything is found, a licensed contractor removes it before we start.

How far ahead should I book a move?

Two to four weeks is comfortable; Fridays at the end of the month go first. We'll always try to help at short notice.

Are you insured?

Yes. Our certificates come with your quote, and we're happy to add your managing agent or freeholder as an interested party where they ask for it.

How do payments work?

Building: stage payments against completed work, with the final payment after sign-off. Demolition: a deposit, then the balance at completion. Removals: a deposit to hold the date, the rest on the day. The details are in your quote.

Free survey · fixed written quote

Tell us what needs lifting.

Building, taking down or moving — or all three. We'll come and look, and send a fixed written quote within five working days.